BRANCHEN
- Tunnelbau
- Betonfertigteile
Products
- Stationäre Dosieranlage - TOWER BETON
Land
- Norwegen
The Simem Way
Oslo
Project Details
plant capacity
12.000 m3
total production
500.000 m3
application
Longest twin tube rail “Follo Line” 140.000 segmental linings
Supplied Equipment
Three Simem “Beton-Towers” plants completely insulated and heated