img

Wet Beton 120 Twin – Trojena

The Simem Way

Saudi Arabia

Simem has been selected as the supplier for the concrete production facilities in Trojena, a key development within the ambitious NEOM project in Saudi Arabia.

The plant provided by Simem is specifically designed to meet the demanding conditions of the mountainous region, ensuring high performance, environmental sustainability, and continuous production in a logistically challenging environment.

Thanks to its advanced technology and modular design, the Simem batching plant enables efficient operation with reduced environmental impact, aligning with the eco-conscious vision of the Trojena project. Its reliable output and adaptability make it a crucial element in supporting the large-scale construction efforts required to bring this innovative destination to life.

Project Details

plant capacity

total production

application

Supplied Equipment

Get in Touch