Integrated Solution for Tunneling – Italy

The Simem Way

Brenner Tunnel

SERVICES PROVIDED:

  • Conceptual Design
  • Mechanical Engineering
  • Fabrication of all Equipment
  • Commissioning
  • On-Site Training
  • Site Support

Project Details

plant capacity

Customized

total production

Ongoing production

application

Construction of liners for the tunneL, shotcrete plants

Supplied Equipment

Four concrete mixers able to produce 2 m3 concrete each cycle;
Aggregates storage capacity of 2000 m3 with controlled temperature and with an independent charging system for each aggregate; four silos with capacity of 135 m3 each;
Two Eagle plants in the new tunnel for shotcrete