Integrated Solution for Tunneling – Italy

The Simem Way

Brenner Tunnel

SERVICES PROVIDED:

  • Conceptual Design
  • Mechanical Engineering
  • Fabrication of all Equipment
  • Commissioning
  • On-Site Training
  • Site Support

Project Details

plant capacity

Customized

total production

Ongoing production

application

Construction of liners for the tunnerl, shotcrete plants

Supplied Equipment

Four concrete plants able to discharge into two concrete trucks at the same time;
Aggregates storage capacity of 2000 m3 with controlled temperature and with an independent charging system for each aggregate; four silos with capacity of 135 m3;
Four mixers able to produce 2 m3 concrete each cycle.
Two Eagle plants in the new tunnel for shotcrete