Awarded to the PerGenova Breakwater consortium (40% WeBuild, 25% Fincantieri, 25% Fincosit, 10% SIDRA), the project involves the offshore prefabrication of breakwater components, allowing normal port activities to continue during construction.
The breakwater is made up of so-called caissons: massive structures as tall as a 10-story building, built using precast concrete molds. Once completed, the caissons are transported offshore and sunk to depths of more than 50 meters. They are then filled with rubble (partly recovered from the demolition of the old breakwater) and finished directly on site with a closure “plug” on top, where a concrete wave barrier is installed.
This megaproject involves more than 250 workers: each caisson requires up to 20 days to be completed, and the entire breakwater calls for the construction of over 100 caissons.